×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Friday
16
Jan 2026
weather symbol
Athens 9°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> World

Artemis I Launch to the Moon called off due to engine issues

It is scheduled to lift off in 3 days at NASA's Kennedy Space Center in Florida

Newsroom August 29 01:08

The launch of NASA’s historic Artemis I moon mission has been postponed after the team was unable to work through an issue with one of the rocket’s four engines.

>Related articles

Scientists uncover why the moon has a “two-faced” nature

Sick astronaut on mission – NASA considers early return of International Space Station crew

NASA published a new map of the universe; the “SPHEREx” space telescope changes the data landscape

The next opportunity to send the Space Launch System rocket and Orion spacecraft on their journey is September 2, but whether or not another attempt is made that day depends on how testing goes.
“Launch controllers were continuing to evaluate why a bleed test to get the RS-25 engines on the bottom of the core stage to the proper temperature range for liftoff was not successful, and ran out of time in the two-hour launch window,” according to an update from NASA. “Engineers are continuing to gather additional data.”
More information will be shared in a news conference held by NASA at 1 p.m. ET. NASA Administrator Bill Nelson will be joined by Jim Free, associate administrator for NASA’s Exploration Systems Development Mission Directorate and Mike Sarafin, Artemis mission manager.
Vice President Kamala Harris, who traveled to Kennedy Space Center in Florida with second gentleman Doug Emhoff to watch the launch, underscored the United States’ commitment to NASA’s Artemis program in comments made after the postponement.
“While we hoped to see the launch of Artemis I today, the attempt provided valuable data as we test the most powerful rocket in history,” she said via Twitter. “Our commitment to the Artemis Program remains firm, and we will return to the moon.”
The launch team still needs to troubleshoot the engine issue and will keep the rocket in its current configuration to gather data and assess what needs to be done. Both the Space Launch System rocket and Orion spacecraft remain stable, according to NASA officials.
The 322-foot-tall (98-meter-tall) stack is sitting on Launchpad 39B at NASA’s Kennedy Space Center in Florida.
Prior to the scrub, the countdown was extended into an unplanned hold as the launch team worked on a troubleshooting plan for one of the rocket’s four engines.

more at cnn.com

 

Ask me anything

Explore related questions

#moon#NASA launch#NASA's Artemis program#space
> More World

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

Sophie Turner’s first photo as Lara Croft released for Tomb Raider series

January 15, 2026

Obst sealed the win at the end against Panathinaikos as Bayern defeated them 85–78 in Munich

January 15, 2026

“You think you are descendants of Plato and Aristotle, but you’re not” – Rama’s tirade against Greek journalist, watch video

January 15, 2026

“Aunt Pecu,” who lived outside all protocol: Who the unconventional and eccentric princess Irene was

January 15, 2026

High-tech fraud – SMS blaster attack: Bank data stolen using special equipment installed in a car’s trunk

January 15, 2026

Ballistic missile strike hits pier in Ukraine

January 15, 2026

Ursula von der Leyen from the Green Line: Pushing for a solution to the Cyprus issue is a priority

January 15, 2026

The ordeal of a 28-year-old Greek man in Australia: He went on holiday to visit relatives, was injured at a beach, and is at risk of quadriplegia

January 15, 2026
All News

> Politics

Hydrocarbon contracts in Parliament, Greece as an energy hub with Saudi Arabia and investments in the background

The consortium includes the American Chevron and the Greek HELLENiQ Energy, with the Minister of Environment and Energy, Stavros Papastavrou, stressing that, if the explorations pay off, the benefits for the country will be multiple

January 15, 2026

Pavlos Marinakis: In principle, agreement for Mitsotakis–Farmers meeting on Monday at noon

January 15, 2026

At 12%–14%: Tsipras and Karystianou reshape the opposition

January 15, 2026

Fidan: Dates being considered for Erdoğan–Mitsotakis meeting in February

January 15, 2026

The Hellenic Navy welcomes the frigate “Kimon” – Mitsotakis: “It is my duty to hand over a safer homeland than the one I inherited” (updated)

January 15, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα