×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Saturday
17
Jan 2026
weather symbol
Athens 10°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> World

Turkey’s Russian-built nuclear plant could amplify Moscow’s regional influence

Some experts are warning that Turkey’s first nuclear power plant, which is being built by Russia's Rosatom, might become a tool to advance Russian interests in the region

Newsroom November 24 07:00

A potential security threat has emerged for NATO and Europe at large: the construction of Turkey’s first nuclear plant. Experts say the project by Russia and Turkey could allow Moscow to establish a commercial port in Turkey’s Mediterranean province of Mersin.

The plant, which will be built and financed by a subsidiary of Russia’s nuclear energy firm Rosatom, is set to have its first reactor operational by May 2023 under the Turkish-Russian agreement signed in July 2022 between Rosatom subsidiary Akkuyu Nukleer and the Turkish firm TSM Enerji, which is owned by three Russia-based companies.

Some 200 kilometers (120 miles) from Cyprus and NATO’s Kurecik early-warning radar station and also near the Syrian border, the Akkuyu Nuclear Power Plant is in a highly strategic location that may prove to be an important regional asset for the Kremlin. The Russian navy already operates a large naval base in Tartus, Syria, some 250 kilometers (155 miles) from Mersin.

Billing itself as the “biggest project in the history of Russian-Turkish relations,” the nuclear power plant is planned to house four generating reactor units, which is expected to produce 10% of Turkey’s electricity needs by 2026 and create many job opportunities. While an original agreement for the construction was signed in 2010 between Akkuyu Nukleer and the Turkish firm IC Ictas, it was later on terminated and a new one was signed over the summer for TSM to undertake the remaining building work. The estimated $20 billion plant ultimately seems to favor Russia, as it was funded almost entirely by Rosatom and provides its entities with a majority stake. While a 2018 deal was reportedly concluded in which Moscow would retain 51% and sell 49% stakes to Turkish firms, later reports claimed this arrangement collapsed and that Russian entities now possess 99.2% of the shares. The site is also Rosatom’s first application of a build-own-operate model in which Russia is in charge of its design, construction, maintenance, operation, training of Turkish personnel and eventual dismantling.

See Also:

>Related articles

Trump threatens tariffs against those who oppose U.S. plans for Greenland

X is down, thousands report problems

CIA chief in Venezuela meets with Rodriguez

“Athens. The City is the Museum” project – Immersive Google Audio tour of the City (video)

Several elements linked to the Akkuyu plant have raised national and international concerns. These have partly stemmed from some of the reported clauses in the initial agreement that could prove to be problematic in the current international climate. They include allowing for the development and construction of all necessary supportive infrastructure without any limitations, permitting technology transfers and the exchange of information between parties in the field of nuclear installations and activities and provision of nuclear and non-nuclear systems, equipment and material for the plant’s construction.

Read more: Al Monitor

Ask me anything

Explore related questions

#Akkuyu nuclear plant#diplomacy#military#missiles#nuclear weapons#politics#russia#turkey#world
> More World

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

Mitsotakis on the Karystianou party: “There is a long distance between being the parent of a tragedy victim and being the leader of a political party”

January 17, 2026

Patras in carnival mode – This evening, the city’s official opening ceremony

January 17, 2026

Greenland as the first line ofdefense for the U.S. and NATO:

January 17, 2026

Changes at top universities: Oxford abolishes the term ‘doctores’ for inclusion reasons

January 17, 2026

Where affordable housing falls short in Greece: IOBE proposes a cap on rent increases

January 17, 2026

Weather: Noticeable drop in temperature from today – Where it will snow and at which altitudes

January 17, 2026

One dead after train–bus collision at the Port of Hamburg – see photos

January 16, 2026

President of Air Traffic Controllers: Another communications blackout possible in the near future

January 16, 2026
All News

> Politics

Mitsotakis on the Karystianou party: “There is a long distance between being the parent of a tragedy victim and being the leader of a political party”

Prime Minister Kyriakos Mitsotakis spoke on Saturday morning about the proposed Karystianou party, his forthcoming meeting with Turkish President Recep Tayyip Erdoğan, and his scheduled meeting with farmers on Monday

January 17, 2026

Mitsotakis attends the inauguration of the renovated Emergency Department at Red Cross Hospital

January 16, 2026

Marinakis: Anestidis has no place in a meeting with Mitsotakis; The video with insults crosses the line of decency

January 16, 2026

Gerapetritis: ‘Extension of territorial waters will come, as marine parks and spatial planning’

January 16, 2026

Hydrocarbon contracts in Parliament, Greece as an energy hub with Saudi Arabia and investments in the background

January 15, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα