×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Friday
16
Jan 2026
weather symbol
Athens 15°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> Economy

TAP pipeline has entered its final stage of completion

The TAP pipeline will have a total length of 878 km

Newsroom December 28 03:31

82.4% of the project for the construction of the TAP pipeline – which is expected to supply natural gas from Azerbaijan to Greece, Albania and Italy – has been completed, while 10% of the respective offshore part of the pipeline under the Adriatic Sea has been completed.

Every day, as the high-level executives of the consortium managing the project point out, hundreds of meters with the Right of Way are being cleaned and shaped, while the pipes are being connected, welded, placed in the trench and covered with soil according to the construction stages and the timetable of the project.

The TAP pipeline will have a total length of 878 km.

At its highest point, in Potom, Albania, the pipeline will reach 2,100 meters above sea level, cross nine mountain peaks over 500 meters above sea level and will “climb” over a 40% a steep slope, while the deepest part of the submarine section will be 820 meters in the Adriatic Sea.

>Related articles

Less alcohol and lower speeds with the new Highway Code and strict fines

Why seasonal flu is so “aggressive” this year: An infectious disease specialist from “Sotiria” explains the two main causes

Mitsotakis attends the inauguration of the renovated Emergency Department at Red Cross Hospital

The overall construction phase of the project is expected to be completed in the second half of 2019, as Italian Prime Minister Giuseppe Conte has given the green light for the completion of the TAP pipeline, expressing his support for the project after many months of negotiations and constant concern over the objections of the Italian side.

The aim, according to the consortium’s managing director, composed of BP (20%), SOCAR (20%), Snam (20%), Fluxys (19%), Enagás (16% 5%), is for 100% of the part of the pipeline passing through the Greek territory to have been completed within 2019.

Source: Nefeli Tzanetakou/balkaneu

Ask me anything

Explore related questions

#albania#economy#energy#greece#Natural Gas#oil#pipeline#Trans Adriatic Pipeline’s (TAP)
> More Economy

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

Less alcohol and lower speeds with the new Highway Code and strict fines

January 16, 2026

The historic cafes of Athens: 12 legendary hangouts lost to time

January 16, 2026

Why seasonal flu is so “aggressive” this year: An infectious disease specialist from “Sotiria” explains the two main causes

January 16, 2026

Mitsotakis attends the inauguration of the renovated Emergency Department at Red Cross Hospital

January 16, 2026

Where insects go in winter

January 16, 2026

Zelensky: If an agreement is reached, we are ready to sign even next week

January 16, 2026

Actress Melpo Zarokosta dies at 93

January 16, 2026

11 Iconic meze dishes from Volos

January 16, 2026
All News

> Economy

Greek firms secure key roles in Libya’s reconstruction

21 Memoranda of Understanding in Benghazi with the Reconstruction Fund - Metlen, TERNA, ADMIE, Archirodon, THEON, TTSA, SALFO, HILLCON and the Greek business footprint in energy, networks, infrastructure, health, pharmaceuticals, food, education and digital projects

January 16, 2026

Latsis Group: This is the new project of Aura Residential’s 219 apartments in Elliniko

January 16, 2026

Industry: Energy deadlock after Commission’s “no” to Italian pricing model

January 16, 2026

ENFIA discounts explained: How home insurance unlocks up to 20% off – 21 answers from AADE

January 16, 2026

Tourism: Greece, Athens, and Attica lead with over 4.75 billion euros in revenue by 2019—Doubling previous figures

January 15, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα